Installation planning · 2026-10-16
How to Prepare Your Site for an HOCl Generator
A practical overview of water, power, equipment space and commissioning information for a smoother installation.

Prepare an installation brief before the generator arrives. It should describe the water supply, power supply, available space, feed handling and the points where the generated solution will be used. This allows Xiaoya and the local installer to coordinate the equipment layout.
Identify the water source and any treatment already installed. Provide a recent water-quality analysis where available, along with pressure and flow at the intended connection. Salt-fed configurations require purified water and an appropriate salt-feed arrangement.
Confirm voltage, frequency and phase for the proposed model. Electrical installation and protection should follow the equipment instructions and local requirements. Keep electrical work with a qualified installer.
Plan access for feed replenishment, routine checks and maintenance. Generator dimensions do not include every external tank or service clearance. If a buffer tank is required, include its usable volume, location and delivery-pump arrangement in the layout review.
Agree who supplies the connections, tanks, pumps and instruments. Specify the commissioning checks and the operating records needed for handover. Xiaoya provides English installation guidance, relevant videos and remote video commissioning support, with arrangements agreed for your order.
Send the layout, utility information and project selection form to Xiaoya before finalizing your installation plan.
Discuss your project ↗













