Illustrative empty poultry house during between-flock downtime
XIAOYA / POULTRY FARM SYSTEM PLANNING

On-site HOCl systems
for poultry farms.

Bring on-site generation to empty-house hygiene, equipment cleaning routines and isolated waterline maintenance. Prepare the supply for your next flock turnaround.

01 / BETWEEN-FLOCK HYGIENE

Prepare the house.
Prepare the next cycle.

Match on-site solution supply to the surfaces, equipment and isolated lines in your turnaround plan.

A / EMPTY HOUSE & EQUIPMENT

Supply the cleaning team.

Tasks
Selected housing surfaces, tools and equipment after manure removal and cleaning.
Timing
House availability, simultaneous work and the time left before restocking.
Release
Required application, recovery and inspection steps before the next flock.
B / ISOLATED WATERLINES

Plan maintenance during downtime.

Condition
Inspect deposits, materials and accessible sections before choosing the cleaning procedure.
Isolation
Keep the maintenance task separate from drinking-water supply and other feeds.
Return to use
Complete the required flushing, checks and authorised release before reconnecting.

This page does not recommend dosing poultry drinking water or spraying occupied houses.

02 / SOLUTION SUPPLY

Generate on site.
Deliver to a defined task.

Locate the generator and collection points around the team's work. Treat isolated-line maintenance as a separate procedure.

ON-SITE SUPPLY
GenerateCheck outputCollect or transfer

Define solution flow, concentration, any holding and task identification.

Separate each task and its operating procedure
  1. Isolate & inspect

    Confirm access, line condition and separation from live supply.

  2. Clean & treat

    Follow the reviewed cleaning and sanitation procedure.

  3. Flush & recover

    Complete required recovery steps and liquid disposal.

  4. Check & release

    Document acceptance before reconnecting for use.

Size for the work window. Use actual task volumes and overlapping demand to plan production and any buffer.

Capacity planning
03 / BETWEEN-FLOCK TURNAROUND

Plan backwards
from the release check.

Agree the site’s acceptance criteria and available downtime. Then allocate the work, solution volume and equipment time.

  1. 01

    Remove & clean

    Address manure and organic matter using the established cleaning procedure before the specified hygiene treatment.

  2. 02

    Apply the agreed procedure

    Define the surface or isolated line, application method, required conditions and the person responsible.

  3. 03

    Complete the recovery steps

    Include flushing, drying or other steps where required by the procedure and equipment instructions.

  4. 04

    Check & release

    Record the required checks and resolve deviations before the authorised team returns the house or line to use.

04 / SUPPLIED FIELD REFERENCE

Bengbu, Anhui.
Equipment in its working setting.

Xiaoya supplied equipment to a farm in Bengbu. The equipment and poultry-house photographs show the installation environment.

Original Xiaoya generator photograph from the Bengbu poultry project training slide
Equipment location & service access
Original poultry house aisle photograph from the Bengbu training material
05 / EQUIPMENT REQUIREMENTS

Plan around your poultry-house demand. Include every sanitation task.

Bird numbers provide context. Actual task solution flow and volume, output specification and simultaneous use determine the equipment brief.

Production & task

Poultry type, age or stage, houses, intended use and the available downtime and release requirements.

Water & demand

Source-water information, measured solution volume per task, peak periods, operating hours and distribution conditions.

Site & ownership

Electrical supply, feed availability, access, the operating team and the scope of existing tanks, pumps and controls.

Review both feed routes.

Select around local feed supply, water requirements and the confirmed operating point. Neither route is an automatic choice for every poultry farm.

06 / BEFORE THE SYSTEM ENTERS SERVICE

Coordinate the
operating plan.

Agree responsibilities for changes, interruptions and recovery before routine operation begins.

Keeping maintenance separate from flock water

Confirm isolation and authorised release with the farm team. Do not use this maintenance plan as a drinking-water treatment protocol. Any proposed animal-contact use must be discussed separately with Xiaoya and the responsible veterinarian.

Out-of-spec readings or interrupted supply

Agree who responds, what is isolated and how an acceptable alternative supply is maintained. Confirm the checks needed before returning to operation.

Maintenance and spare parts

Assign routine checks, service access and consumable or spare-part responsibilities. Use the maintenance guide to structure the equipment discussion.

Expanding to other poultry tasks

Occupied-house spraying, egg treatment and other animal-contact uses require their own intended-use review. Do not transfer the isolated-line or empty-house plan to a different task without that review.

07 / YOUR POULTRY PROJECT

Tell us the task.
We’ll discuss the system.

Share your country, poultry type, operating stage, houses and intended use. Include known task solution demand and source-water information. Unknown figures can be discussed.

Discuss My Poultry Project