COMPARE THE PROJECT REQUIREMENTS
Choose an HOCl generator around its job, its connections and the people responsible for keeping it running.
Compare the requirements ↓COMMERCIAL VS INDUSTRIAL HOCl GENERATORS
Supplier labels alone do not tell you how long a generator can run, how it connects to your process or what support is included.
A facility collecting solution at one point may need a straightforward operating arrangement. A site supplying several processes may need additional storage, delivery equipment and control coordination.
Start with the responsibilities the complete system must fulfil. Then compare the proposed configuration.
COMPARE SCOPE, NOT A MARKETING GRADE
These procurement patterns help define your project. Commercial facilities may require complex system integration, while some industrial sites need a simple collection arrangement.
A defined collection point and manageable collection windows.
Several use points, varying demand or a required delivery pressure.
Confirm the supply points, quantities and delivery method.
Staff can schedule production and respond to a pause.
An interruption affects an operating process or several teams.
Agree duty limits, response responsibilities and a backup plan.
Local settings and checks may cover the workflow.
The proposal may need signals, interlocks or coordination with other equipment.
Specify each required interface; do not assume it is standard.
The unit is accessible to a designated operator.
Service access, component replacement and plant schedules need coordination.
Review the layout, maintenance tasks and spares scope.
Operators need instructions and agreed commissioning checks.
The project may require additional drawings, test records and training documentation.
List deliverables and acceptance criteria in the quotation.
A CONCRETE EXAMPLE FROM XIAOYA’S PRODUCTS
AQ-P300-A and AQ-P300-W show why enclosure size alone is not a useful performance grade. Their supplied product tables list the following values.
Range endpoints from the supplied tables. Confirm flow at the target FAC.
| Published item | AQ-P300-A | AQ-P300-W |
|---|---|---|
| Generation range | 120–300 L/h | 120–300 L/h |
| Available chlorine | 10–200 ppm | 10–200 ppm |
| Rated power | 420 W | 420 W |
| Electrolyte tank | 5 L | 5 L |
| Listed dimensions | 500 × 510 × 1500 mm | 390 × 340 × 910 mm |
DEFINE THE COMPLETE SUPPLY
Output and operating conditions
Water preparation, storage and delivery
Requested signals and functions
Utilities, layout and operators
Xiaoya’s hypochlorous acid generator features PLC programming, with optional functions for storage, atomization, and timing. Please request a written list detailing the included equipment, available options, and items that must be provided on-site.