COMPARE THE PROJECT REQUIREMENTS

Commercial vs industrial
HOCl generators.

Choose an HOCl generator around its job, its connections and the people responsible for keeping it running.

Compare the requirements ↓

COMMERCIAL VS INDUSTRIAL HOCl GENERATORS

A bigger cabinet
is only one difference.

Supplier labels alone do not tell you how long a generator can run, how it connects to your process or what support is included.

A facility collecting solution at one point may need a straightforward operating arrangement. A site supplying several processes may need additional storage, delivery equipment and control coordination.

Start with the responsibilities the complete system must fulfil. Then compare the proposed configuration.

COMPARE SCOPE, NOT A MARKETING GRADE

What changes as
the project gets more demanding?

These procurement patterns help define your project. Commercial facilities may require complex system integration, while some industrial sites need a simple collection arrangement.

Supply task

SIMPLER ARRANGEMENT

A defined collection point and manageable collection windows.

MORE INVOLVED PROJECT

Several use points, varying demand or a required delivery pressure.

ASK THE SUPPLIER

Confirm the supply points, quantities and delivery method.

Operating responsibility

SIMPLER ARRANGEMENT

Staff can schedule production and respond to a pause.

MORE INVOLVED PROJECT

An interruption affects an operating process or several teams.

ASK THE SUPPLIER

Agree duty limits, response responsibilities and a backup plan.

Controls & connections

SIMPLER ARRANGEMENT

Local settings and checks may cover the workflow.

MORE INVOLVED PROJECT

The proposal may need signals, interlocks or coordination with other equipment.

ASK THE SUPPLIER

Specify each required interface; do not assume it is standard.

Maintenance access

SIMPLER ARRANGEMENT

The unit is accessible to a designated operator.

MORE INVOLVED PROJECT

Service access, component replacement and plant schedules need coordination.

ASK THE SUPPLIER

Review the layout, maintenance tasks and spares scope.

Handover evidence

SIMPLER ARRANGEMENT

Operators need instructions and agreed commissioning checks.

MORE INVOLVED PROJECT

The project may require additional drawings, test records and training documentation.

ASK THE SUPPLIER

List deliverables and acceptance criteria in the quotation.

A CONCRETE EXAMPLE FROM XIAOYA’S PRODUCTS

Different dimensions.
The same published output range.

AQ-P300-A and AQ-P300-W show why enclosure size alone is not a useful performance grade. Their supplied product tables list the following values.

AQ-P300-A and AQ-P300-W · supplied product data
Published itemAQ-P300-AAQ-P300-W
Generation range120–300 L/h120–300 L/h
Available chlorine10–200 ppm10–200 ppm
Rated power420 W420 W
Electrolyte tank5 L5 L
Listed dimensions500 × 510 × 1500 mm390 × 340 × 910 mm
Explore the AQ-P300 series

DEFINE THE COMPLETE SUPPLY

One generator.
A clearly agreed system scope.

Xiaoya’s hypochlorous acid generator features PLC programming, with optional functions for storage, atomization, and timing. Please request a written list detailing the included equipment, available options, and items that must be provided on-site.

Review integrated system options

A BETTER BASIS FOR YOUR ENQUIRY

Describe the job.
We can discuss the configuration.

Tell Xiaoya where the solution will be used, how it will be collected or delivered, the target FAC and what an interruption would mean for your operation.

Discuss your equipment scope