XIAOYA / THE LANGUAGE OF YOUR PROJECT

HOCl & Generator Glossary.

Understand the terms in your specification. Find a plain-language definition, then explore the details that matter to your project.

01

Chemistry & measurement

Chlorine demand

The chlorine consumed by reactions with substances in the water or process over stated conditions and time. It is different from the volume of solution the site needs.

Explore related guidance
#

Contact time

The duration of exposure required for a defined treatment under specified conditions. For surface disinfection, follow the applicable product directions and facility procedure, including the required wet contact conditions.

Explore related guidance
#

FAC

Free available chlorine

A measurement of free-chlorine species, commonly reported as mg/L as Cl₂. State the analytical method and reporting basis when comparing results.

Explore related guidance
#

Free chlorine residual

The free chlorine remaining at a specified location and sampling time. A dose or generator-outlet value does not automatically equal the residual at the use point.

Explore related guidance
#

HOCl

Hypochlorous acid

A chlorine-containing acid present in aqueous free-chlorine chemistry. Its proportion relative to hypochlorite depends on pH and other conditions. Buyer note: a FAC result is not a direct measurement of pure HOCl mass percentage.

Explore related guidance
#

ORP

Oxidation-reduction potential

An electrochemical potential measured relative to a reference electrode, commonly in millivolts. There is no universal conversion from ORP to FAC.

Explore related guidance
#

pH

A measure related to hydrogen-ion activity. It influences the balance between HOCl and hypochlorite; it does not, by itself, establish disinfectant concentration or performance.

Explore related guidance
#

ppm

Parts per million

A ratio that requires a stated basis. For dilute aqueous solutions with density close to 1 kg/L, 1 ppm by mass is approximately 1 mg/L; identify what is being measured, such as FAC as Cl₂.

Explore related guidance
#
02

Output & supply

Buffer tank

Storage used to separate the timing of generation from the timing of withdrawal. Usable volume, solution condition and refill sequence matter more than nominal tank capacity alone.

Explore related guidance
#

FAC mass rate

The rate of free available chlorine output on the stated reporting basis. L/h × mg/L ÷ 1,000 gives g/h as Cl₂ equivalent when both inputs refer to the same operating point.

Explore related guidance
#

On-site generation

Producing solution at the facility or near the intended use. The scope may also require feed preparation, water treatment, monitoring, storage and delivery equipment.

Explore related guidance
#

Rated output

A stated equipment output under specified operating conditions. Confirm flow, FAC, pH, feed water and operating schedule together; separate maximum values may not be achievable simultaneously.

Explore related guidance
#

Solution demand

The volume of solution needed over a stated period and at a defined specification. Include simultaneous users and peak withdrawal as well as the daily total.

Explore related guidance
#

Use point

The location where the solution is applied or enters the customer’s process. Its conditions may differ from those at the generator outlet.

Explore related guidance
#
03

Equipment & controls

Electrolyzer

The electrochemical cell or assembly in which electrode reactions take place. Its construction, operating limits and service requirements are configuration-specific.

Explore related guidance
#

Feed water

Water supplied to the generator after any required preparation. The required quality and pressure depend on the equipment configuration.

Explore related guidance
#

HMI

Human-machine interface

The screen or interface used to view and operate the system. A displayed value should be traced to its sensor, test result or configured input.

Explore related guidance
#

Interlock

Logic that prevents or changes operation when defined conditions occur. Confirm the inputs, resulting action and restart conditions for the proposed configuration.

Explore related guidance
#

PLC

Programmable logic controller

A controller used for equipment sequences, signals and control logic. A PLC brand alone does not establish the available communication protocols or functions.

Explore related guidance
#

Setpoint

A target value used by a control system. It is not automatically the actual measured value at the generator or use point.

Explore related guidance
#
04

Procurement & verification

FAT

Factory acceptance test

Checks performed before shipment against agreed equipment requirements and acceptance criteria. Confirm what will be tested and documented in the quotation scope.

Explore related guidance
#

Process validation

Documented evidence that a defined process can consistently meet predefined requirements under stated conditions. A general laboratory report is not automatically validation of the customer’s installed process.

Explore related guidance
#

SAT

Site acceptance test

Checks performed after installation against agreed site and equipment requirements. Passing an equipment check does not automatically validate every application outcome.

Explore related guidance
#

TCO

Total cost of ownership

Costs over a defined ownership period, including the agreed initial project scope, operation, maintenance and relevant replacements. Compare alternatives using the same task, usable demand and cost basis.

Explore related guidance
#

PUT THE TERMS INTO CONTEXT

Have a specification to clarify?

Tell Xiaoya the term, requirement or operating condition you want to discuss.

Ask About Your Specification