XIAOYA · PROCUREMENT WORKSHEET

Prepare your
HOCl generator RFQ.

Compare supplier responses against the same requirements. Record scope, deviations and acceptance conditions before committing to a purchase.

Discuss your RFQ

An optional printable worksheet for buyers comparing quotations. You can contact Xiaoya before every requirement is known.

ONE BASIS FOR EVERY SUPPLIER

Keep the enquiry comparable.

Issue the same requirement revision to each supplier. Describe the treatment point, daily and peak demand, operating hours, known FAC/pH requirements, water source and site utilities. Mark unknowns for review.

Project / site
RFQ reference / revision / date
Supplier / quotation reference
Model / proposed configuration

Complete the parameters you can provide in the Xiaoya Group HOCl Selection Form and send it to Xiaoya. We will develop a customized proposal from your project information.

FROM REQUIREMENT TO AGREEMENT

Make differences visible before comparing price.

Request a response

Ask each supplier to mark requirements as met, conditional or not offered. Identify the document or specification supporting the response.

Record deviations

List proposed alternatives, assumptions, exclusions and open questions. Clarify their effect on output, site work, cost and delivery.

Confirm the agreement

Resolve important differences before comparing totals. Carry the agreed scope and acceptance conditions into the purchase documents.

Preparing a project budget? Review equipment and ownership costs.

QUOTATION SCOPE

Ask suppliers to make the scope explicit.

For each relevant item, ask whether it is included, optional, customer-supplied or excluded. Leave unresolved items open for discussion.

Scope items to clarify in the quotation
ItemWhat to clarifyStatus / response / reference
GeneratorModel, output conditions and feed requirements
Water & feed preparationTreatment equipment, tanks and preparation responsibilities
Storage & deliveryStorage tanks, pumps, dosing and distribution
Controls & interfacesMonitoring, alarms and connection requirements
Installation & trainingLocal works, commissioning support and documents
Consumables & sparesProposed items, quantities and replacement needs
Packing & transportPackaging, delivery destination and commercial shipping terms

Agree how the equipment will be accepted.

These matters remain to be discussed; please identify the appropriate checks and balances as well as the division of responsibilities for the proposed models and projects.

Performance, deviations and acceptance record
DecisionWhat to agreeSupplier response / open points
Output conditionsFlow, FAC and pH together with feed water, feed material, operating conditions and agreed tolerances.
Verification methodSampling point, measurement method, test duration and records needed to assess the agreed output.
Factory / site checksWhich checks occur before shipment and after installation; who performs, witnesses and approves them.
Open deviationsRequirement, proposed alternative, effect on price or schedule, responsible person and resolution date.
Documents & handoverModel-specific document list, language, training scope and the evidence required before handover.
Commercial comparisonCurrency, shipping basis, delivery scope, payment terms, warranty and service terms as quoted.
SUPPORTING INFORMATION

Useful if available.
Not a barrier to starting.

No water report or drawing yet? Describe the water source and site first. Further information can be agreed during the configuration review.

This checklist does not upload files. Discuss the appropriate way to share project documents with your contact.