XIAOYA / BUYER QUESTIONS
HOCl generator FAQs.
A clear starting point.
Short answers, with a route to the detail.
12 questions
No matching questions.
Try fewer words or another topic. You can also ask Xiaoya about your project.
Contact XiaoyaSelecting equipment
Which feed route should I choose: HCl or salt?
Xiaoya offers HCl-fed and salt-fed equipment. Start with your required flow and available-chlorine concentration, source water and local feed availability. Share the intended use so the proposed configuration can be reviewed against the task. The two routes have different feed and water-preparation requirements.
Compare generation methodsHow do I work out the output I need?
Provide your daily solution demand, operating hours and peak collection periods. If you know the required available-chlorine concentration, state it alongside the flow. A flow rating by itself is not enough to define the operating point. If demand is unknown, describe the tasks and collection schedule first.
Plan generator capacityDo I need a generator alone or an integrated system?
That depends on how the solution will be collected, stored and delivered. Xiaoya can discuss configurations with water preparation, storage and delivery equipment. Describe any tanks, pumps or distribution equipment already on site, then agree which items and connections belong in the proposed supply scope.
Explore integrated systemsSite preparation
Does my source water need treatment?
Water requirements depend on the feed route and selected configuration. Tell Xiaoya whether you use mains water, well water or treated water, and share available water information. Discuss the required pretreatment before specifying the unit; water-treatment equipment should be identified in the proposal rather than assumed to be included.
Review water and feed requirementsWhat should I prepare before installation?
Share the proposed equipment location, available space, water supply, electrical supply and any planned tanks or distribution lines. Request the connection and utility requirements for the quoted configuration. Include room for operation and maintenance, and confirm any drainage or ventilation arrangements with the installation plan.
Prepare for installationCan power supply, screen language or connections be adapted?
For project-specific change requirements, both parties may engage in consultations. During the inquiry phase, please specify your requirements regarding voltage and frequency, interface language, and connectivity. Products offered by Xiaoya support English-language interfaces and customized engineering solutions. Before placing an order, please be sure to confirm the availability, cost, and scope of services for your chosen model.
Explore custom engineeringOperation & support
Can the generator run continuously without attention?
Routine operation includes feed replenishment, output checks and maintenance. Tell us your required concentration, dosage and duty cycle. Storage, timing and automation functions can be configured around a fixed operating requirement.
Plan maintenance and spare partsWhat should I send when I need service or a spare part?
Start with the equipment model, serial number if available, and a clear photograph of the operating screen or relevant part. Describe the issue and when it occurs. Xiaoya can use this information to identify the equipment and discuss the next step; avoid ordering a part from appearance alone.
Request equipment supportCan Xiaoya help my team with commissioning remotely?
Xiaoya provides English installation guidance, installation videos and remote video commissioning support. Agree the order documents, local installation responsibilities and support arrangements. Connected monitoring and remote control require a separate compatibility review for your location.
Review commissioning supportPurchasing & documents
Can I ask for a proposal before I have a full specification?
Yes. Start with your country, application and the task you want the equipment to support. Add the required output and concentration if known, together with any site constraints. Identify unknowns rather than guessing. These details provide a starting point for discussing a suitable configuration and the information still needed.
Prepare your RFQWhich documents can I review for supplier approval?
You can view or download documents directly from the website. Contact our sales team for additional parameters or documents.
View certificates and test documentsWhat should I check in the equipment quotation?
First review the generator configuration, output specifications and included equipment. Then clarify water treatment, tanks, pumps, instruments, documents, spare parts, packaging and commissioning. The quotation identifies included and optional items so you can compare total prices.
Review equipment scope and costYour question may be
specific to your site.
Share the application, equipment you are considering and the point you need to clarify. You do not need a complete specification to start.














