Xiaoya Group workshop with industrial equipment, technicians and overhead cranes
XIAOYA GROUP · MANUFACTURING CAPABILITIES

Industrial experience.
HOCl engineering.

Explore system components, generator assembly and the checks available before your equipment ships.

From an industrial group to your equipment package. Xiaoya’s manufacturing history dates to 1964. Here, examine the components and work behind our HOCl systems.

About Xiaoya Group
ENGINEERING YOU CAN EXAMINE

Inside a salt-fed
HOCl system.

An example from the XY-AEOW100L configuration list: electrolysis, dosing, controls and water preparation brought together as an equipment package.

XY-AEOW100LConfiguration example
GENERATION & DOSING

Electrolysis assembly

Electrode assemblies, peristaltic pumps and an adjustable electrolysis power supply.

Liquid connections
PVDF connectors and PTFE fittings / valves appear in this configuration.
Maintenance planning
A defined component list identifies pumps, tubing, valves and electrodes for service discussions.

PLC & touchscreen

PLC control with analog and digital expansion modules, plus a SMART 700 touchscreen.

Control hardware and operator interface

Process instrumentation

pH and ORP electrodes/controllers, a conductivity transmitter and flow sensors.

Different instruments for different parameters

Water preparation

A 500 L/h pure-water unit, a 500 L raw-water tank and a 500 L pure-water tank.

Water-treatment capacity, not HOCl output

Brine & solution storage

A 60 L brine-dissolving tank and a 200 L solution-storage tank.

Listed storage configuration
Xiaoya installation showing separate pH and ORP instruments beside a Siemens touchscreen
FROM COMPONENTS TO THE OPERATOR PANEL

Know what the display is measuring.

The installation photo shows separate pH and ORP instruments beside the touchscreen. These readings describe different solution properties; neither replaces an available-chlorine measurement.

Review the output checks
ON THE PRODUCTION FLOOR

The work inside
the cabinet.

Xiaoya’s production design brings together electrical connections, fluid pipelines and the equipment layout inside the enclosure.

Technician installing pipework inside a Xiaoya generator cabinet
Pipework assemblyFluid connections and component placement inside the enclosure.
Technician working on electrical wiring and terminal connections at Xiaoya
Electrical assemblyWiring and terminal connections in the control panel.
Xiaoya technician using a laptop next to a generator control panel
Control setupTechnician working with the equipment controls and a laptop.
ENGINEERING AROUND YOUR SITE

Define the interfaces.
Then define the package.

HCl-fed and salt-fed generators are both available. Site connections, cabinet requirements and control functions form part of the project configuration review.

Fluid interfaces
Connection sizes, source water and the required storage / distribution scope.
Equipment envelope
Cabinet dimensions and colour requirements for the proposed installation.
Control integration
Custom control logic and integration requirements for the customer's PLC or supervisory system.
FACTORY CHECKS & BUYER INSPECTION

Four parameters.
One equipment review.

Factory checks cover production rate, available chlorine, pH and ORP. Each answers a different question about the solution your system produces.

Output checks and their role in procurement
ParameterWhat it tells youWhat to agree for your order
L/hProduction rateThe volume of solution produced per hour.Required output at the specified concentration and operating conditions.
mg/LAvailable chlorineThe measured available-chlorine concentration of the sample.Target concentration, sampling point and test method.
pHAcidity / alkalinityThe pH of the generated solution.Required operating range for the selected model and application.
mVORPThe solution's oxidation-reduction potential.Use as a supporting parameter alongside chlorine and pH measurements.
BEFORE DISPATCH

Inspect the equipment
you are buying.

Arrange a factory inspection

Video inspection

Review your equipment remotely with the Xiaoya team.

Third-party inspection

Arrange an independent inspector to review the agreed equipment scope.

Inspection timing, witness checks, records and any associated costs are agreed for the order.

INSTALLATION & STARTUP

A handover your
installation team can use.

Xiaoya Group supports overseas setup with English guidance and remote video commissioning. Define the document package around the equipment being supplied.

Plan installation & commissioning

English manuals & videos

Guidance for equipment installation, preparation and operation.

Connection drawings

Pipework and electrical information for the installer, with layout information where required.

Remote commissioning

Video support for startup with your local installation team.

YOUR NEXT EQUIPMENT PROJECT

Review the system.
Define your scope.

Share your required output, application, country and available water supply. Xiaoya can develop the equipment scope and inspection arrangements with you.

Request your system proposal Explore integrated systems