What needs solution?
Define the task, required solution specification and actual demand.







Explore our manufacturing footprint
About Xiaoya ↗Look beyond the equipment specification.
See the site conditions around an installation.
Use these records to discuss equipment positioning, service access and local connections. The documented scope varies by project.
The supplied installation record identifies a Dongping kindergarten project and an HCl-fed AQ-P100-4G unit. This accompanying clip shows the utility area and visible local pipework.
Xiaoya completed a 2025 installation at a swine farm. This different view from the original video shows a pump, local pipework and part of the adjacent tank.
It gives buyers a concrete starting point for discussing installation space and the division between generator supply and site accessories.
View the farm record & original video
The source also identifies a salt-fed installation in Zibo. Its cabinet and surrounding equipment provide another reference for discussing the space and utilities required for a salt-fed installation.
Explore salt-fed equipmentA similar setting starts a useful conversation. Your task, output requirement and site conditions determine the configuration.
Define the task, required solution specification and actual demand.
Share available space, source water, power and maintenance access.
Agree responsibility for the generator, tanks, pumps, connections and commissioning.
Tell Xiaoya which record is relevant, where your project is located and how you plan to use the solution.