XIAOYA / FROM THE FIELD

HOCl generator
installations.

Look beyond the equipment specification.
See the site conditions around an installation.

Explore the records

Find the setting
closest to your project.

Use these records to discuss equipment positioning, service access and local connections. The documented scope varies by project.

DONGPING / SHANDONG, CHINA

A compact installation.
A local service point.

The supplied installation record identifies a Dongping kindergarten project and an HCl-fed AQ-P100-4G unit. This accompanying clip shows the utility area and visible local pipework.

Documented equipment
AQ-P100-4G, HCl-fed, as identified in the source.
What the clip shows
Utility-area fittings and a collection location. The generator itself is not shown in this clip.
What to compare
Staff access, collection location and the route between equipment and the work area.
See the campus supply context
JIEYANG / GUANGDONG, CHINA

The connections
around the generator.

Xiaoya completed a 2025 installation at a swine farm. This different view from the original video shows a pump, local pipework and part of the adjacent tank.

It gives buyers a concrete starting point for discussing installation space and the division between generator supply and site accessories.

View the farm record & original video
Original Jieyang farm video frame showing a pump and pipe connections beside a tank
Zibo: a different equipment format.

The source also identifies a salt-fed installation in Zibo. Its cabinet and surrounding equipment provide another reference for discussing the space and utilities required for a salt-fed installation.

Explore salt-fed equipment

Translate a reference
into your own site brief.

A similar setting starts a useful conversation. Your task, output requirement and site conditions determine the configuration.

APPLICATION

What needs solution?

Define the task, required solution specification and actual demand.

SITE

Where will it operate?

Share available space, source water, power and maintenance access.

SCOPE

Who supplies each part?

Agree responsibility for the generator, tanks, pumps, connections and commissioning.

Review installation preparation

Have a similar
installation in mind?

Tell Xiaoya which record is relevant, where your project is located and how you plan to use the solution.