planning visualization based on supplied Xiaoya generator imagery; illustrative equipment setting
INSTALLATION & COMMISSIONING

HOCl installation,
planned together.

Prepare your site, define installation responsibilities and arrange startup support with Xiaoya Group.

English installation guidance Connection information Remote video commissioning
BEFORE THE EQUIPMENT ARRIVES

Bring the site
into the plan.

These are the details that help define the installation. Start with what you already know.

AI illustration of engineers reviewing site layout and access requirements

Exact utilities, clearances and connections follow the selected equipment and project drawings.

Review system scope

Electrical supply

Provide the available voltage and frequency. Your local installer should review the required supply and protective arrangements against the equipment documentation.

Space & access

Send the usable area, ceiling restrictions and equipment access route. Include space for operation, maintenance and any external tanks or treatment equipment.

Storage & use points

Identify existing tanks and pumps, where solution will be used, approximate distances and height differences. These help define the delivery interfaces.

Site environment

Describe the indoor or outdoor location, temperature conditions, drainage and ventilation. Requirements depend on the equipment and local installation rules.

AGREE THE RESPONSIBILITIES

One project.
Clear installation roles.

Use this division of work to define your project scope before shipment. The final responsibilities belong in the supply agreement.

Xiaoya Group

  • Equipment-specific English guidance and installation videos.
  • Pipework and electrical connection information for the supplied equipment.
  • Remote video commissioning support as arranged for the project.

Your site & local installer

  • Accurate site information and the agreed utilities.
  • Local installation work by appropriately qualified personnel.
  • Site access, operators and any existing process connections.

Confirm together

  • Equipment boundaries, layout and connection requirements.
  • Startup participants, timing and remote support arrangements.
  • Required output checks, handover information and any open items.

On-site attendance, travel, integration work and any additional services are agreed separately for the project.

LAYOUT & CONNECTION PLANNING

Plan beyond
the generator cabinet.

Include water preparation, storage, delivery and access in the equipment discussion. The generator is one part of the installation.

What is already on site?
Identify existing tanks, pumps and the intended use points.
What belongs in the supply?
Define which equipment and connection information Xiaoya will provide.
What does the installer need?
Agree the layout, utility requirements and interfaces before installation.
Explore integrated systems

Your installation plan

Planning overview
Water & feed Site utilities
HOCl equipmentSelected model & configuration
Storage & delivery Your use points
Connection information Startup guidance

Review the interfaces together. The equipment package determines the final layout and connections.

Explore original installation records

FROM INSTALLATION TO HANDOVER

Prepare for
the first startup.

A useful commissioning conversation starts with the equipment identity, site readiness and the people who will operate it.

AI illustration of a local technician discussing generator startup by video; not a real customer or Xiaoya staff photograph
  1. 01

    Confirm the setup

    Review the installed model, connection information and the readiness of the agreed water, feed and electrical supply.

  2. 02

    Arrange startup support

    Coordinate the local installer and operator with Xiaoya for the agreed remote video guidance.

  3. 03

    Review operating output

    Check the operating results against the requirements for your selected model and project. Record the conditions alongside the readings; use the pH, available-chlorine and ORP measurement guide to distinguish what each reading tells you.

  4. 04

    Complete the handover

    Identify the operator guidance, documents and outstanding questions your team needs before routine operation.

INFORMATION FOR YOUR INSTALLATION TEAM

The right guidance,
for your equipment.

English manuals, installation videos and remote video commissioning are available through Xiaoya. Specify the documents and assistance included with your equipment.

Discuss installation documents

English equipment guidance

Installation and operating information for the selected model.

Connection information

Pipework and electrical drawings for the supplied equipment, with layout information where required.

Installation video guidance

Supporting visual instructions for your local installation team.

Remote commissioning

Video coordination with the people working at the equipment.

PLAN YOUR INSTALLATION WITH XIAOYA

Tell us about
your site.

Start with your country, intended model or output requirement, site conditions and installation schedule.

Discuss your installation