Water & feed
Share the water source, any available water-quality report, supply pressure and flow information. Identify the intended HCl-fed or salt-fed route and review the generator feed-water and electrolyte requirements.







Explore our manufacturing footprint
About Xiaoya ↗
Prepare your site, define installation responsibilities and arrange startup support with Xiaoya Group.
These are the details that help define the installation. Start with what you already know.

Exact utilities, clearances and connections follow the selected equipment and project drawings.
Share the water source, any available water-quality report, supply pressure and flow information. Identify the intended HCl-fed or salt-fed route and review the generator feed-water and electrolyte requirements.
Provide the available voltage and frequency. Your local installer should review the required supply and protective arrangements against the equipment documentation.
Send the usable area, ceiling restrictions and equipment access route. Include space for operation, maintenance and any external tanks or treatment equipment.
Identify existing tanks and pumps, where solution will be used, approximate distances and height differences. These help define the delivery interfaces.
Describe the indoor or outdoor location, temperature conditions, drainage and ventilation. Requirements depend on the equipment and local installation rules.
Use this division of work to define your project scope before shipment. The final responsibilities belong in the supply agreement.
On-site attendance, travel, integration work and any additional services are agreed separately for the project.
Include water preparation, storage, delivery and access in the equipment discussion. The generator is one part of the installation.
Review the interfaces together. The equipment package determines the final layout and connections.
A useful commissioning conversation starts with the equipment identity, site readiness and the people who will operate it.

Review the installed model, connection information and the readiness of the agreed water, feed and electrical supply.
Coordinate the local installer and operator with Xiaoya for the agreed remote video guidance.
Check the operating results against the requirements for your selected model and project. Record the conditions alongside the readings; use the pH, available-chlorine and ORP measurement guide to distinguish what each reading tells you.
Identify the operator guidance, documents and outstanding questions your team needs before routine operation.
English manuals, installation videos and remote video commissioning are available through Xiaoya. Specify the documents and assistance included with your equipment.
Discuss installation documentsInstallation and operating information for the selected model.
Pipework and electrical drawings for the supplied equipment, with layout information where required.
Supporting visual instructions for your local installation team.
Video coordination with the people working at the equipment.
Start with your country, intended model or output requirement, site conditions and installation schedule.
Discuss your installation