study of a Xiaoya control panel, illustrative rather than a recorded factory inspection
XIAOYA GROUP / BEFORE DISPATCH

HOCl factory checks.
Defined around
your order.

Agree what to inspect, which operating conditions to record and how your team will review the equipment before shipment.

Discuss My Inspection Requirements
START WITH THE EQUIPMENT YOU ORDERED

Know what
you are checking.

Xiaoya’s factory responses identify production rate, available chlorine, pH and ORP as output checks. The order specification gives those measurements a useful basis.

01

Establish the
comparison point.

Planning a custom configuration?
Equipment identity
Model, order reference and the configuration to be inspected.
Supply scope
Generator, agreed accessories, options and external equipment.
Operating basis
Water and feed conditions, output setting and the required performance range.
Inspection arrangements
Checks, witness method, records and the people responsible for the review.
MAKE THE RESULTS INTERPRETABLE

A reading needs
its context.

Use this outline when discussing the records for your equipment. It shows the information to request, not a completed Xiaoya test report.

OUTPUT CHECK / RECORD OUTLINEPlanning example · no results

EQUIPMENTModel · configuration · order

TEST CONDITIONSWater · feed · settings · time

CheckRecord alongside the resultReview against

Production rate L/h

Collection volume and time, or the agreed flow-measurement method.

Output required at the agreed concentration and operating conditions.

Available chlorine mg/L

Chlorine quantity measured, method, range, sample location and any preparation.

The specified concentration range and reporting basis.

pH pH units

Sample identity, measurement method and relevant sample conditions.

The pH range agreed for the equipment and output.

ORP mV

Electrode system and the conditions of the measured sample.

Its defined supporting role; it does not replace chlorine testing.

Results · agreed criteria · observations · reviewerMeasurement guide
CHOOSE HOW YOUR TEAM WILL REVIEW

Two ways to
witness the equipment.

Xiaoya supports video inspection and third-party inspection. Arrange the time, scope and personnel for your order. We communicate any associated costs in advance.

REMOTE REVIEW

Video inspection

Agree a session covering equipment identity, the requested views and selected checks. Nominate the people who need to participate.

Prepare before the call
Order reference, viewing checklist, questions and time zone.
Agree the record
Which observations or documents will be shared after the session.
INDEPENDENT VISIT

Third-party inspection

Share your inspector’s checklist in advance so access, test conditions and responsibilities can be discussed with Xiaoya.

Prepare before the visit
Inspector details, proposed date, test scope and acceptance criteria.
Agree the record
The inspector’s reporting requirements and how open items will be handled.
DEFINE THE DOCUMENT PACKAGE

What should
travel with the order?

Separate equipment guidance from inspection records and application evidence. Ask which documents can be provided for your selected configuration.

Review document references
  1. 01

    Equipment & operating guidance

    Xiaoya provides English installation guides, connection information and related videos.

  2. 02

    Order-specific inspection records

    Request the agreed results, observations and outstanding items. Confirm record availability and format before making them a purchase requirement.

  3. 03

    Supporting test documents

    Match any supporting report to the tested sample, method and scope. A general product report is not automatically the factory record for your machine.

FROM FACTORY TO SITE

Agree the next
checkpoint too.

Factory checks review the agreed equipment under recorded conditions. Installation checks and application validation address the equipment at your site and the process it serves.

Can the factory reproduce our local water conditions?

Water quality depends on many factors and can be difficult to reproduce. Share your available water analysis so we can assess representative conditions and address remaining differences during site commissioning.

Will every unit include a complete test report?

Equipment is supplied with product reports and operating instructions. Confirm the documents required for your order.

Can we include alarms and control functions?

List the functions to witness and their expected responses. Agree the safe test method and the configuration concerned before inspection. Review control requirements.

What if an observation needs follow-up?

Identify the item, responsible contact and evidence needed to close it. Agree how it affects acceptance or shipment before completing the inspection review.

YOUR ORDER. YOUR INSPECTION REQUIREMENTS.

Plan the review
before dispatch.

Share the model or order reference, destination, checks you need and preferred inspection method. Xiaoya Group can discuss the scope and arrangements with your team.

Discuss My Inspection Requirements