Conceptual engineering project review space with technical binders and a laptop
ENGINEERING & PROCUREMENT

HOCl Generator
Resources

Find the guide for your next decision, from equipment selection and sizing to project costs, quotations and technical documents.

What do you
need to decide?

Start with the question you have today. Use these guides individually or return as your project develops.

Which generator fits my project?

Generator Selection

Define the application, compare feed routes and clarify the equipment scope before choosing a model.

Read the Selection Guide

How much capacity do I need?

Generator Sizing

Review daily demand, peak use and the operating window to prepare a useful capacity discussion.

Review Sizing Inputs

What belongs in the project budget?

Cost & Ownership

Separate the machine quotation from site work and running costs. Build a comparable budget around your operating conditions.

Explore Project Costs

How do I compare supplier offers?

RFQ Preparation

Record scope, assumptions, deviations and acceptance requirements so important differences stay visible.

Open the RFQ Checklist
UnderstandSpecifyDiscuss

Need to understand
the technology first?

Explore HOCl chemistry, generation methods, measurements, feed-water requirements and system controls. Then return to the buying guides to turn those concepts into project requirements.

Explore HOCl Technology

Look up a term in the HOCl Glossary →

Equipment issue? Find a troubleshooting starting point →

Find information for
the equipment you are evaluating.

Technical documents

Find online guidance or request information relevant to a proposed configuration. Include the model, intended use and destination where known.

Visit Technical Documents

Testing and validation

Understand the different roles of equipment checks, solution measurements and application validation before interpreting a result.

Read the Validation Guide

Preparing the site
or supporting an existing system?

Have an equipment or procurement question? Read the HOCl generator FAQ for answers and links to detailed guides.

Installation & commissioning

Review site preparation and the information needed to coordinate installation and start-up.

Review Installation Support

Maintenance & spare parts

Plan maintenance and identify the equipment details needed for a spare-parts discussion.

Explore Maintenance Support

Existing-equipment service

Share the equipment identity and the issue you need help with through the dedicated service route.

Request Technical Service

You do not need
every answer to start.

Tell Xiaoya what you want the system to do, the approximate demand and where it will operate. Include any questions you would like to resolve.

Discuss Your Project